525-ci qəzet

Ahmad Ahmadzadeh: “Most of the reinforcement works of the dam cleaved as a result of Kura flood in Bayramli settlement have been finished”


To him, total restoration will be finished within some days.
Ahmadzadeh said that most part of the dam had been closed: “Currently, one quarter volume passes through the dam. Strong current has been prevented. Total strengthening process will be conducted here”.





12.05.2010     Çap et  Çap et